Skip to main content

AZUVIA

Powering Possibilities, Innovating Boundaries

ECHLOR-CTE1 De Nora CTE Cell Replacement

Tubular electrochlorination cells installed in a containerised seawater electrochlorination system

Replacement ElectrolysersECHLOR-CTE1: built to replace De Nora CTE cells.

ECHLOR-CTE1 is AZUVIA’s De Nora CTE cell replacement: an ECHLOR cell built to fit your existing De Nora CTE system. It matches your connections, flow and rectifier output, so the new cells drop in without rebuilding the skid.

How it works

  • Send us the nameplate, drawings or photos of your current cells
  • We confirm the match and any upgrade options
  • We build, test and ship the replacement set
  • Optional: our engineers install and commission on site

BackgroundAbout the De Nora CTE system

De Nora supplies concentric tube electrolyser (CTE) cells as part of its SEACLOR seawater electrochlorination range. These cells are popular offshore because they run at high velocity and stay clean without acid.

Like any coated anode, a CTE cell loses output as its coating wears. Lead times for original cells can also be long. A De Nora CTE cell replacement from AZUVIA brings the system back to full output on a shorter schedule.

Engineered to fitHow ECHLOR-CTE1 matches your cells

ECHLOR-CTE1 is our concentric tube cell for this duty. Seawater flows through the gap between two titanium tubes at high velocity, so deposits do not build up.

We match the cell length, flanges and electrical connections of your existing De Nora CTE cells. Therefore, the new cells install in the same positions and run from your existing rectifier. We confirm the details from nameplates, drawings or photos before manufacture.

Learn more about the design on our ECHLOR CTE page.

Warning signsWhen to plan a De Nora CTE cell replacement

Most cells give clear warning signs long before they stop. For example, the rectifier voltage rises at the same current, or the measured chlorine residual falls even though flow is steady. You may also see more frequent alarms, uneven current between cells or visible damage to the coating.

Any of these signs means it is time to plan a De Nora CTE cell replacement. Ordering early lets you fit the new cells during a planned docking or shutdown, rather than after a failure. Meanwhile, the old cells can keep running at reduced output.

If you are unsure, our engineers can review your operating data and inspect the cells on site. Our site surveys and health checks give you a clear report on remaining life, so you can budget with confidence.

BenefitsWhy choose AZUVIA for your De Nora CTE cell replacement

First, you keep everything else. Because ECHLOR-CTE1 is a one-to-one fit, there is no change to pipework, cabling or controls. As a result, installation takes hours rather than weeks.

Second, you get shorter lead times and a lower price than many original parts. We build in our own factory, so we can plan around your docking or shutdown date.

Finally, you deal directly with the engineers who design the cells. With more than 20 years of service experience in electrochlorination, we know how these systems behave in the field.

  • One-to-one replacement with no modification
  • Improved electrode coating for long, stable output
  • Every set tested before shipment
  • Warranty of 2 to 5 years, depending on the contract
  • Expected cell life of 5 to 10 years, depending on duty

ProcessFrom enquiry to commissioning

It starts with your data. Send us the nameplate details, photos and, if available, the drawings of your De Nora CTE cells. In addition, tell us your seawater flow, required chlorine output and rectifier rating.

Next, our engineers confirm the match and any upgrade options. Then we quote the ECHLOR-CTE1 with a clear delivery date. Once you order, we build and test the cells, and we ship them with installation instructions.

If you prefer, our field engineers install and commission the cells on site. They also check the rectifier, controls and dosing points, so the whole system returns to design output. Regular dosing also supports good practice under the IMO biofouling guidance.

FAQFrequently asked questions

Is ECHLOR-CTE1 the same cell you supply for Chloropac MK1?

The design family is the same, but each set is built to the dimensions and rating of the cells it replaces. We confirm these details for every order.

How long does a De Nora CTE cell replacement take?

Lead time depends on quantity and duty. However, it is typically shorter than for original parts, because we build in our own factory. We confirm the date when we quote.

Do I need to change the rectifier?

Usually not. ECHLOR-CTE1 is built to work with your existing rectifier. If an upgrade would help, we will explain why and offer options from our Rectified Power Systems range.

Can you refurbish my cells instead?

Sometimes refurbishment is the better choice. See our electrolyser refurbishment service, and we will advise which option costs less over the cell life.

RelatedOther ECHLOR replacement cells

ECHLOR-CTE1 for Chloropac MK1

Chloropac MK1 Replacement Cells.

Learn more →

ECHLOR-CTE2 for Chloropac MK2

Chloropac MK2 Replacement Cells.

Learn more →

ECHLOR-CTE3 for Chloropac MK3

Chloropac MK3 Replacement Cells.

Learn more →

ECHLOR-PPE for SEACLOR

SEACLOR Replacement Cells.

Learn more →

ECHLOR-BPX for Magneto

Magneto Cell Replacement.

Learn more →

ECHLOR-MPC for SANILEC

SANILEC Replacement Cells.

Learn more →

See all models on our replacement electrolysers page, or browse the knowledge base.

De Nora, De Nora CTE and other names are trademarks of their respective owners. AZUVIA is not affiliated with these companies; products are described as compatible replacements.

Tell us what's possible.

Send us your duty, feedwater and location. An AZUVIA engineer will reply.