---
title: Modification of Flameproof Enclosures
description: Any modification of flameproof enclosures can invalidate their certification and make them unsafe. Flameproof enclosures are supplied complete with all internal components fitted and certified as a single entity by a recognised test authority. The testing procedure will take into…
url: "https://www.azuvia.co/kb/flameproof-ex-d/basics-on-the-modification-of-flameproof-enclosure/"
updated: "2026-11-07"
category: Explosion Proof Basics / Flameproof (Ex d)
---

# Modification of Flameproof Enclosures

Any modification of flameproof enclosures can invalidate their certification and make them unsafe.

Flameproof enclosures are supplied complete with all internal components fitted and certified as a single entity by a recognised test authority. The testing procedure will take into account the **free** **internal volume** after all the components have been fitted, the **temperature rise** (determined by the maximum power dissipation), **creepage and clearance distances**, and the **rise in pressure** as a result of an internal explosion using a gas/air mixture in its most explosive proportions.

The certification effectively “freezes” the design of the equipment so that **any unauthorised** **modifications will invalidate the approval/certification**. Therefore, the following points should be observed.

- **Replacement of components should always be exactly the same** as the original specified components in order to avoid infringement of the certification. A component larger or smaller than the original will affect the internal geometry of the enclosure. Pressure piling is a possibility if a larger component is fitted, and increased volume will result if a smaller component is fitted.

![modification to a flameproof enclosure](https://www.azuvia.co/wp-content/uploads/2026/11/improper-modifications-to-flameproof-enclosures.png)

- **Adding components is also forbidden**because of the possibility of increased explosion pressure as a result of pressure piling.

- **The removal of components must also be avoided** since an increase in the free internal volume will result. The original test results, prior to certification, would be compromised as a result of a modification such as this.

**Some other unauthorised modifications**

- Use of wrong size / type of hole sealing plug
- Use of wrong size / type of cable entry gland
- Misuse of constructional screws or bolts
- Attaching cable brackets using cover fixing bolts
- Drilling holes
- Adding / removing gaskets
- Using hardening sealants or tapes
- Changing layout of components
- Adding additional components
- Removing or omitting components

## Avoiding modification of flameproof enclosures

The rule is simple: if it is not on the certificate, do not change it. Before any work, check the certificate and the manufacturer's documentation, and use only approved spare parts. When an enclosure needs a different layout or extra components, ask the manufacturer to modify and recertify it rather than making changes on site.

Inspectors look for typical signs of unauthorised changes, such as extra drilled holes, non-certified glands or plugs, missing or wrong bolts, added gaskets and painted or damaged flamepaths. Any of these can invalidate the protection, so record and correct them promptly.

For related guidance, read [pressure piling](/kb/flameproof-ex-d/basics-on-pressure-pilin/) and [flameproof enclosure construction](/kb/flameproof-ex-d/basics-on-flameproof-construction/). Flameproof equipment is certified through the [IECEx scheme](https://www.iecex.com/).
